The Town has contracted with R.J. Piche Excavating to replace an existing 48” diameter cross culvert located between #96 and #88 Old Colchester. The road will be closed at the project location for the duration of three days starting on May 28th, 2024. After which, the contractor will maintain at least one lane of traffic using temporary traffic control flaggers through the remainder of the project.